Related News
On the design and capital raising of theme park from the perspective of operation-4
March 20, 2020On the design and capital raising of theme park from the perspective of operation-4 The operation team is the most clear about the effect of project operation. What kind of product operation team tourists need is most clear. WhiviewAqua Blue Water Park was Open to Public with many water slide equipment
July 7, 2017Aqua Blue water park has opened to the public on 19th May 2017. As the biggest and most advanced water park in Africa, people, and media from all parts of society came to Aqua Blue and witnessed this moment, many water slide equipment then was open to pubviewHow to maintain the large water slide equipment for children
June 3, 2020Children's water park equipment is mainly capableof entertainment and entertainment for water slide equipment, which containsmore products, especially in the annual amusement equipment manufacturers w...viewPay attention to these places when building water park
September 17, 20201.The types of water park equipmentare not asmany as possible The businesssite of the water park is determined, but some investors have the idea that themore water park equipment the more attractive ...viewWater park with "0" safety accidents
February 18, 2020Important Links in Safe Operation of Water Park There are many types of large-scale amusement equipment in Lishui Water Park. At present, the largest number of water slides in China are described below. Water slides are used as an example to briefly explviewHow to build a water park? The detailed process is here-1
April 16, 2020Water park is one of the most popular theme tourism products in recent years. Generally speaking, the construction period of the water park is 6 to 18 months, the first two years are the return period, and the third year is the profit period. If the waterview