close
+86 13509963615
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

Company News

Company News

  • An Analysis of China's Water Park Issues - part twoAn Analysis of China's Water Park Issues - part two2020/04/10Question 4: Not paying attention to operation Not paying attention to operation is one of the common problems of domestic water parks. Water parks are ultimately operated by people and provide service experience for tourists.
  • An Analysis of China's Water Park Issues - part oneAn Analysis of China's Water Park Issues - part one2020/04/09The time has come to the second decade of the 21st century. Looking back at the first decade of this century, everyone who is familiar with the domestic amusement industry knows that this is a decade of rapid development of the Chinese amusement industry.
  • The final aim of management is customer's experienceThe final aim of management is customer's experience2020/04/08The final aim of management is customer's experience Nowadays, water parks are built on an entertaining and fast-paced environment and water management becomes more and more important in water park. A professional water park management in a fast-paced
  • Three strategies to maximize the profit of water parks with short operating cyclesThree strategies to maximize the profit of water parks with short operating cycles2020/04/07Three strategies to maximize the profit of water parks with short operating cycles As we all know, water parks are seasonal tourism products. July and August are the peak sales season for water parks, and the operating income during the peak season ac
  • An Analysis of China's Water Park IssuesAn Analysis of China's Water Park Issues2020/04/03An Analysis of China's Water Park Issues Author: Fang Long The time has come to the second decade of the 21st century. Looking back at the first decade of this century, everyone who is familiar with the domestic amusement industry knows that this is a
  • Design of moving line of parking lot and entrance-4Design of moving line of parking lot and entrance-42020/04/02There are several ways to calculate the parking lot area of theme park, but they are generally calculated according to the instantaneous peak value of the park's tourist volume. We commonly use the way we call it "theme park market penetration method".
  • Design of moving line of parking lot and entrance-3Design of moving line of parking lot and entrance-32020/04/01For the more common parking lot, the ground should be hardened and set according to the relevant specifications; it is suggested to set sidewalks on the side, with a certain height difference from the parking lot ground.
  • What problems can easily occur in the construction of water park?What problems can easily occur in the construction of water park?2020/03/31What problems can easily occur in the construction of water park? In the water park equipment, the technology of the indoor swimming pool equipment is simple and mature, so it is often overlooked by the design. Although many domestic indoor swimming p
  • Move forward under the epidemicMove forward under the epidemic2020/03/30The sudden outbreak of coronavirus not only severely affected people's health and daily life, but also disrupted the pace of the market, had a huge impact on various industries, and endangered the normal development of the country's economy. As a basic pa
  • Design of moving line of parking lot and entrance-2Design of moving line of parking lot and entrance-22020/03/27--Disabled parking space--- The width of general disabled parking spaces is 2.5m * 1.6x = 4.0m, with a length of 5m; according to China's specifications, more than 200 parking spaces need to be set up, with more than 4 disabled parking spaces. At on
  • Design of moving line of parking lot and entrance-1Design of moving line of parking lot and entrance-12020/03/26Design of moving line of parking lot and entrance-1 When we talk about theme parks, most people will think of the happy atmosphere, comfortable environment, rich amusement experience projects and so on. But in addition to these, I think many people wil
  • On the design and capital raising of theme park from the perspective of operation-6On the design and capital raising of theme park from the perspective of operation-62020/03/25As a design unit, the designer will constantly require Party A to raise funds for its operation during the design process, while Party A will ask the designer, your design unit is professional, we have given you design fees, so you should design my projec
  • On the design and capital raising of theme park from the perspective of operation-5On the design and capital raising of theme park from the perspective of operation-52020/03/23As a theme park operator, do you often ask - why do we need to raise funds for many designs in the design process? Do they specialize in design or not? Our operation tells the design unit how to design, then we have become engaged in design, what should
  • On the design and capital raising of theme park from the perspective of operation-4On the design and capital raising of theme park from the perspective of operation-42020/03/20On the design and capital raising of theme park from the perspective of operation-4 The operation team is the most clear about the effect of project operation. What kind of product operation team tourists need is most clear. Whi
  • On the design and capital raising of theme park from the perspective of operation-2On the design and capital raising of theme park from the perspective of operation-22020/03/18Viewpoint 1 When first dabbling in the theme park industry, does the owner think that it's better to build a theme park, find a planning and design unit to carry out professional design at all stages, build a construction unit, and let the oper
  • On the design and capital raising of theme park from the perspective of operation-1On the design and capital raising of theme park from the perspective of operation-12020/03/16At the beginning of 2020, the outbreak of new coronary pneumonia has led to many theme parks across the country to announce the "closed Park" announcement, which makes it easy to close the door. However, for the operation subject, the pressure can be imag
Online Servicetq_online