Related News
Water park construction period
July 17, 2020If we do not consider the time for investor’s approvalprocedures and if civil engineering and water slide equipment production start at the sametime, the construction period of the water park project...viewHaisan Won the Chinese Aquatic Amusement Equipment Industry "Oscars
July 7, 2017With the demands of tourists and technical chances, new type of amusement theme parks comes to a brand-new stage, and developed into a fully innovative developing platform. According to the developing...viewWater slide safety
June 24, 2020The safety of water slide includes three mainfactors, water flow, floating gear, tourist posture and so on. The strength andangle of the water slide design can cause safety accidents. Chongqing Caribb...viewSafety operation management of water park three / three
March 12, 2020There are a lot of accidental injuries in Water Park, various bumps and abrasions, etc. We counted this year, and the registered accidental injuries are about 0.5 per thousand. The scratches on water slides accounted for about 70 to 80 of them. One day thviewCleaning methods and steps of facilities and toys for water amusement park
January 15, 2018The water amusement park is often floating with various water toys on the water, but the cleaning and repairing of the water toys is a must for a toy shop or a toy bar. It is also a business project o...viewProblems and Solutions in the Management of Current Theme Water Park from HAISAN water slide company
May 16, 2019The huge market prospects bring huge challenges, and the intensification of market competition leads to many theme water parks from HAISAN water slide company being only ephemeral. What's wrong with our theme water park? Why can't we continue to operate?view