close
+86 13509963615
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

Differentiated and Integrated Design of the Water Rides Supplier

Differentiated and Integrated Design of the Water Rides Supplier

Ⅰ. Differentiated design of the water rides supplier


In order for a water park to achieve differentiation and sustainable development from other market products, it is very important to have an IP that tourists like and accept, and it is also an important work for cultivating potential customers.


This "IP style" first achieved excellent results in the film and television cultural industry, and then it was logically introduced into the field of water park equipment.


After abandoning the traditional "just play" style of piling up equipment, the water park has gradually moved towards theming. A complete and interesting story line has been set up during the play so that the whole process of the visitor's amusement park is like "watching a movie", thus the tourist can be impressed by the park.


Ⅱ. Integrated design recommended by the water rides supplier


The planning of the theme park has developed in the direction of integrated design. The overall design is a complete process, from the overall planning and layout, to the design of the architectural form, the research and development of the theme IP, the integrated design of landscape architecture, and the introduction of performance shows... The increasing abundance of elements requires a whole new theme park planning and design.


1. Planning stage


Project site selection, consumer orientation, planning layout, and product differences must be considered in an integrated manner. Places with convenient transportation and beautiful environment should be chosen to attract tourists; combined with IP system construction to enhance market adhesion and stimulate secondary consumption; rationally plan venues to maximize reception; increase product differentiation and improve product market's competitiveness. These designs require the water rides supplier to be very professional.


2. The plan deepening stage


When designing, the theme IP must be the priority, and the theme is the soul of the park. After setting a theme, the park is separated, but not scattered. The environment of each district is built around this big theme with a story line, and the result of the arrangement of various theme park equipment will be more interesting. The theme can clarify the building and equipment packaging style, strengthen the indoor and outdoor connections, enrich the landscape and plant configuration, make the style of the park more coordinated, and highlight the characteristics of the park. In addition, the theme can deepen and strengthen visitors' awareness of the park and enhance the immersive experience of visitors.


Related News
  • How to Choose a Good Water Park Equipment Manufacturer

    How to Choose a Good Water Park Equipment Manufacturer

    October 15, 2018First, manufacturers credit qualification inquiryTo find out whether an enterprise is reliable or not, first of all, it is necessary to know the basic information of an enterprise. Investors can visit...view
  • How to Judge the Water Park Equipment?

    How to Judge the Water Park Equipment?

    January 15, 2018There is a lot of water park equipment manufacturers in the market, when the investors are planing for a water amusement park, to choose water park equipment make them feel comfused. Here Haisan will ...view
  • Waterland Lebanon

    Waterland Lebanon

    August 20, 2018Swimming is a kind of ways for people to relax and cool off at the same time. There is just a no better way to do it anyway. Jumping into a pool with your friends and family and trying to splash water...view
  • Special Requirements for Aqua Park Equipment

    Special Requirements for Aqua Park Equipment

    January 5, 2021When the aqua park equipment leaves the factory, it must be accompanied by the manufacturer's certification, use and maintenance instructions and relevant drawings and other accompanying documents...view
  • How to Break the Dilemma of the Short Operation Period in Water Parks?

    How to Break the Dilemma of the Short Operation Period in Water Parks?

    July 6, 2017Every summer,all water parks are full of visitors. According to "2016 summer water play report" based on the platform big data from www.Lvmamam.com, it shows that the number of daily average visitors...view
  • Water Park needs Professional Management

    Water Park needs Professional Management

    July 6, 2017The design of the water park for the youth and the joy of a variety of options. They are built on an entertaining and fast-paced environment. Your water park's management team has a constant array of ...view
Online Servicetq_online