Related News
How to build a water park? The detailed process is here-2
April 17, 2020Basic process of water park construction After obtaining the land use right and project approval, carry out: (1) Conceptual design planning stage 1. Select the concept design unit to carry out the docking of the concept desiviewAqua Blue Water Park was Open to Public with many water slide equipment
July 7, 2017Aqua Blue water park has opened to the public on 19th May 2017. As the biggest and most advanced water park in Africa, people, and media from all parts of society came to Aqua Blue and witnessed this moment, many water slide equipment then was open to pubviewAn Analysis of China's Water Park Issues
April 3, 2020An Analysis of China's Water Park Issues Author: Fang Long The time has come to the second decade of the 21st century. Looking back at the first decade of this century, everyone who is familiar with the domestic amusement industry knows that this is aviewSuggestions of running water slide at the night
July 1, 2019First, look at the night weather in the city where the water slide is located. If the night temperature is much lower than the day temperature (more than 5 degrees), the price of the night venue can be lower than that of the day venue. If the night temperviewA mystery about 95% of the visitor experience from HAISAN water park design - part one
September 16, 2019When the autumn leaves begin to change color and the cold wind ripples over the lazy river, some park operators from HAISAN water park design begin to consider closing their gardens in cold weather and prepare to reopen their gardens in the coming spring.viewShould consider the type of water park equipment
March 8, 2019When investors plan to build a water park, they may ask what type of water park equipment should be built? How large-scale water park is built? And what type of water park will be attractive, etc.view