Water park design steps

Water park design steps

From the beginning to the construction of the project, the water park design plan can be divided into the following seven stages:
1. Planning It was the original source of the project. Mainly for some preliminary thinking of the water park project, including: analysis of higher-level conditions, theme positioning, market positioning, site selection, intention layout mode, basic content planning, etc.

2. Feasibility study At this stage, the feasibility of project planning is verified technically and economically, including policy research, market analysis, planning program research, preliminary investment estimation, financial analysis, impact analysis, and risk analysis, etc., are important links in determining whether the project is established.

3. Master plan After the location is determined, the overall layout and arrangement of the base in time and space will be carried out. At this stage, it is necessary to clarify the scope of land use, land use indicators, building requirements, and supporting facilities.

4.Concept design After the project is settled, the concrete water park design plan is formally invested. Settlement theme story, architectural style, floor plan, moving line setting, water play project configuration, business / service / management facility configuration.

5. Scheme design Continuing the conceptual design stage, comprehensively launching various water park design work, and carrying out special design for architecture, exterior, interior, landscape, lighting, and electrical.

6. Initial design Based on the design of the plan, the façade, size, color, etc. are clarified, and details are marked.

7, construction drawings Implement all design results into construction documents for construction bidding and subsequent construction guidance.

Related News
  • Do you Dare to Challenge the big Trumpet with Amazing Features?

    Do you Dare to Challenge the big Trumpet with Amazing Features?

    November 10, 2017Water park equipment -- the big loudspeaker as the classic equipment of water park, has been popular with water lovers. Swing, slide, and feel weightless in a loudspeaker, and laugh at speed and adven...view
  • A Brief Introduction to the Interactive Water House

    A Brief Introduction to the Interactive Water House

    April 21, 2020Embodied valuable happiness and attractive carefreeness, the Interactive Water House breaks all routine molds and establishes itself as a platform of novelty joy! It has a variety of themes: the pirat...view
  • Super Bowl Slides

    Super Bowl Slides

    April 21, 2020Awarded by the international travel industry, the Super Bowl slide is a must-have for large-scale water parks. Players sit in a clover-shaped float with each one inside one of its four leaves. Starti...view
  • Two Factors that Influence the Operation of Water Park

    Two Factors that Influence the Operation of Water Park

    October 20, 2017The operation of water park is not a simple thing. It involves all aspects and needs a comprehensive grasp of the operator so as to win! Among the many factors affecting water park projects, services ...view
  • How to Choose Water Equipment in Children's Water Park Project

    How to Choose Water Equipment in Children's Water Park Project

    March 28, 2025Cost Considerations for a Water Park ProjectWhen purchasing equipment and facilities for any project, cost budgeting is always a key factor. Only within a set cost budget can a specific equipment inst...view
  • Waterpark Success: Designing the Perfect Water park

    Waterpark Success: Designing the Perfect Water park

    July 6, 2017Defining SuccessFor private developers, the definition of success is simple … to make money! For municipal water parks, however, the definition of success can be:Earn revenues that cover its costs an...view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us