close
+86 13509963615
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

Water park design steps

Water park design steps

From the beginning to the construction of the project, the water park design plan can be divided into the following seven stages:
1. Planning It was the original source of the project. Mainly for some preliminary thinking of the water park project, including: analysis of higher-level conditions, theme positioning, market positioning, site selection, intention layout mode, basic content planning, etc.

2. Feasibility study At this stage, the feasibility of project planning is verified technically and economically, including policy research, market analysis, planning program research, preliminary investment estimation, financial analysis, impact analysis, and risk analysis, etc., are important links in determining whether the project is established.

3. Master plan After the location is determined, the overall layout and arrangement of the base in time and space will be carried out. At this stage, it is necessary to clarify the scope of land use, land use indicators, building requirements, and supporting facilities.

4.Concept design After the project is settled, the concrete water park design plan is formally invested. Settlement theme story, architectural style, floor plan, moving line setting, water play project configuration, business / service / management facility configuration.

5. Scheme design Continuing the conceptual design stage, comprehensively launching various water park design work, and carrying out special design for architecture, exterior, interior, landscape, lighting, and electrical.

6. Initial design Based on the design of the plan, the façade, size, color, etc. are clarified, and details are marked.

7, construction drawings Implement all design results into construction documents for construction bidding and subsequent construction guidance.

Related News
  • A Good Place For Summer Travel

    A Good Place For Summer Travel

    July 31, 2018From the point of view of the booking data, it is expected that the peak will be held in late July to mid-August. The way to travel, the difference between the other time, summer travel for more than ...view
  • Customer Analysis & Security Issues for Water Park

    Customer Analysis & Security Issues for Water Park

    February 25, 2017Customer Analysis for Water Park 1. Common feature: individual customer will occupy a lot, and families, students and couples will be the primary.view
  • Asia's Largest waterpark in Sanya

    Asia's Largest waterpark in Sanya

    August 20, 2018There is a Sanya water park which is the first Atlantis Aquaventure Waterpark in Asia and also the third in the world. As a Sanya water park, 35 entertainment projects all year round are offered by th...view
  • Special Requirements for Aqua Park Equipment

    Special Requirements for Aqua Park Equipment

    January 5, 2021When the aqua park equipment leaves the factory, it must be accompanied by the manufacturer's certification, use and maintenance instructions and relevant drawings and other accompanying documents...view
  • Maintenance and Repair of Mobile Water Park Water Slides

    Maintenance and Repair of Mobile Water Park Water Slides

    February 7, 2024Water slides are usually found in water parks or family parks, with heights ranging from 1 meter to 20 meters. People who want to experience sliding down the water slide walk up the stairs to the top ...view
  • Operation Management Methods of Water Slides

    Operation Management Methods of Water Slides

    November 2, 2020Water parks are large-scale comprehensive amusement places with water as the theme, and they integrate leisure, entertainment and sports in one. With the continuous improvement of people's culture...view
Online Servicetq_online