Guangzhou Haisan Amusement Technology Co., Ltd.
Guangzhou Haisan Amusement Technology Co., Ltd.
Email Us
How to seize market Opportunities Quickly in the Three or Four Line City without Water Park Project?

How to seize market Opportunities Quickly in the Three or Four Line City without Water Park Project?

In the three or four line city without water park project, as long as the main city population is more than two hundred thousand, there are huge market opportunities. The developers of water park should also take advantage of the market competition and threat of the latecomers in order to avoid being overtaken by the latecomers. In order to quickly occupy the water park market opportunities, the following points need attention:

1. Investment scale
Every water park developer should determine the scale of investment in the park according to the local market demand, and blind investment will only lead to project operation difficulties and waste of funds. According to the three or four line of the city's spending power to speculate that the total investment in new water park should be controlled in 50 million (excluding land) within the park area is appropriate, should be within 100 acres, and the corresponding supporting large parking lot.

2. Amusement equipment
In the three or four line city, it is not recommended to buy expensive imported aquatic amusement equipment, such as aqua house. Imported equipments will greatly uplift the construction cost of paradise, will greatly affect the investment recovery period of paradise. In the three or four line city, it is the best choice to choose the more advanced domestic water park amusement equipment with high performance price ratio.

3. Park tickets
The main power consumption of city water park is parents meet the needs of children dabbling, but also back to a relatively high rate of consumer groups. Of these consumer groups, three or four visitors account for the majority. In the three or four line city, because the overall income level is not too high compared to a second tier city, the consumption control of a total of three is less than 300 yuan, this consumer price can be accepted by most tourists. Adult ticket price between 60-80 yuan, half-price ticket of 30-40 yuan, or 40-60 yuan ticket price can be accepted by the majority of tourists.

4. Theme stories
The theme stories of this type of water park can try to occupy the commanding heights of regional culture. Selection of local cultural elements in the known to every family in the history of culture, tells the story of a fun, the ups and downs of the story, let visitors during the course of play into the story of the scene experience, through the theme of the story scenes to increase children's family package tourists revisit rate.

water-park



Related News
  • A Few Tips on Water Park Investment

    A Few Tips on Water Park Investment

    October 28, 2021Water theme park and water park investment is an important part of tourism investment, whose development is extremely rapid. According to the data of water slide, normally those water parks that updat...view
  • Innovation and Development of Water Amusement Equipment in China

    Innovation and Development of Water Amusement Equipment in China

    January 15, 2018In the 1980s and 1990s after the reform and opening up, theme parks were quickly introduced into China, and the early water parks were in the urban amusement parks that appeared in theme parks. The fi...view
  • Precautions of Water Slides for Water Park Operators

    Precautions of Water Slides for Water Park Operators

    May 26, 2020Precautions for Water Park Operators of the Water Slide FacilityMore or Less, the climax of power consumption unstabilizes the electric voltage to fall short for 220V. Always be alert to the warning t...view
  • Discussion on the Cost Control of Water Park

    Discussion on the Cost Control of Water Park

    January 15, 2018Today, let's talk about the most concerned issue for investing a water park project. To invest a water park, except for land which can be purchased or leased, the cost generally includes design cost, ...view
  • Water Park Investment and Benefit Analysis

    Water Park Investment and Benefit Analysis

    August 23, 2021The current water park in the operation period basically show "crowded" scene. Water park construction cycle is usually as long as 0.5-1 years. In the case of normal operation, the first one...view
  • Super Bowl Slides

    Super Bowl Slides

    April 21, 2020Awarded by the international travel industry, the Super Bowl slide is a must-have for large-scale water parks. Players sit in a clover-shaped float with each one inside one of its four leaves. Starti...view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us