Related News

Precautions of Water Slides for Water Park Operators
May 26, 2020Precautions for Water Park Operators of the Water Slide FacilityMore or Less, the climax of power consumption unstabilizes the electric voltage to fall short for 220V. Always be alert to the warning t...view
Water park design steps
December 2, 2019From the beginning to the construction of the project, the design of the water park can be divided into the following seven stages:1. PlanningIt was the original source of the project. Mainly for some...view
Design for quality water park
April 4, 2019Park planningBefore starting the construction of water parks, we should first look for water park equipment manufacturers to do planning scheme, and then arrange the equipments of the water park legit...view
Issues That Need Attention in the Continuous Operation of Water Parks
June 30, 2021At present, the summer water park project has become a sunrise industry, and water park projects have sprung up everywhere. Here, we have listed some issues that need to be paid attention to in the co...view
Water Carnival in Summer, Every Water Park Comes the Peak
October 31, 2017China Jiangsu Network News: With the temperature continues to raise, every water park also comes peak passenger flow. As the summer travel preferred site of Yangtze River Delta and even the national g...view
The suggestions for water park positioning
October 31, 2017According to the recent water park industry and the discussion and analysis between thousands of investors and Haisan in recent years, we have the following suggestions for water park positioning:1.Fo...view
English
Chinese
français
Español
русский
português
العربية
tiếng việt
ไทย
Pilipino
Indonesia
Afrikaans
info@gzhaisan.com
+86 13527814016
+86 13527814016