Steps to Invest Water Parks

Steps to Invest Water Parks

With the development of people's living standard, there are more needs for people to play water, especially water park, which sets recreation, relaxation and entertainment all in one. Water parks are very popular once they are built somewhere. After contacting with so many investors for a few years, we found that they don't know much about the steps of building a water park. We will talk about the steps about investing water parks in detail:

1. Early investigation, before investing a water park project, we should inspect whether it is promising or not. Generally speaking, we are attracted by other water parks because of their flourish scene, so that thinking about it may have good economic profit. Firstly, it is necessary to make a survey in advance, interview other same types' water parks and observe its passenger flows, layout, equipment and management ideas, when they are done, the following step is easy to be carried out.

2. Site selection. After early investigation, investors have known fairly well about how to choose a suit place. It is important to choose place and district, but central district is so expensive, it is the best to choose urban and rural juncture with convenient transportation and low price land, especially some parks and tourist areas. Many investors have their own lands, they will consider whether they are suitable for water park firstly according to early investigation and advice from professional companies, if the answer is not, they will choose another place.

3. Cooperator determination. Investors will choose the best one or two companies to cooperate after field trip to professional company and comparing their planning scheme and budget bill.

4. Contract signing. After making sure the company, the following is to sign a contract, professional company will have a complete construction scheme after contract signing, so the following excavation, capital construction and pre-buried will have a foundation because of drawing.

5. Project construction. Many drain-pipes are needed to be laid according to progress of works in the project construction process. It must pay attention to safety construction. The installment of water park equipment must follow the flow.

6. Market planning. From the beginning of construction, investors are starting their market plans and putting advertising and selling first, it had better invite some professional companies to cooperate and guide.

7. Opening. It is better to test business for a few days firstly after equipment function well and afforest is completely perfected, so that we can adjust according to situation, at the same time , it still can be an advertisement. Finally, that is a grand opening. All project is finished.


Related News
  • The Preparatory Work Before the Water Park Opened

    The Preparatory Work Before the Water Park Opened

    July 6, 2017Before you are ready to open park, work must be done. 1.Do personnel training and investigate equipment safety risks Whether the operation of a water park is able to retain visitors and develop for a ...view
  • Key Points of Water Park Planning and Design

    Key Points of Water Park Planning and Design

    May 12, 2021"Water park equipment" is no longer unfamiliar in the water park industry. Many water parks will conduct a comprehensive investigation on the quality of water park equipment when purchasing,...view
  • The Development Of Water Park

    The Development Of Water Park

    July 6, 20171. Radiation market expansion of business areasSome large group companies operating in the park at the same time, slowly began to expand to other business areas of the market, that is diversified busi...view
  • Water park design steps

    Water park design steps

    December 2, 2019From the beginning to the construction of the project, the design of the water park can be divided into the following seven stages:1. PlanningIt was the original source of the project. Mainly for some...view
  • Whirlwind/Loudspeaker Slide Product Features

    Whirlwind/Loudspeaker Slide Product Features

    April 21, 2020Tourists sit in a four-leaf grass shaped floating circle and start to glide from the starting point of the platform up to 16 meters. They fly into the huge trumpet shaped slide, like being sucked into...view
  • Eight preparations to build a water park

    Eight preparations to build a water park

    April 27, 20181. LocationThe location and scale of the water park are determined based on local available passenger flow, transportation conditions, consumption levels and the self-employed teams. Don't simply imit...view
Online Servicetq_online