Related News
Indoor water park equipment operation management in winter
May 7, 2019Among all the attractions, the most affected by the season is the water park. The water park is known as the "golden 100 days", that is, the best operating time of the water park is only 100 days, and the operating season is between the months of 6, 7, 8,viewDesign of moving line of parking lot and entrance-1
March 26, 2020Design of moving line of parking lot and entrance-1 When we talk about theme parks, most people will think of the happy atmosphere, comfortable environment, rich amusement experience projects and so on. But in addition to these, I think many people wilviewAttention to Key Elements in water slide design phase
June 24, 20191. Operating teams need to intervene, raise demand and supervise implementation at the water slide design stage. All parties should be aware that the construction of the park is for the sake of safety, comfort and operating efficiency of tourists.viewImprovement of Safety Measures for Water Park Equipment
October 15, 20191. Measures to confirm the status of water park equipment in operation. 2. One of the major differences in the operation of most water park equipment in mobile game projects is that the departure of tourists/rafts is determined by the operator of the eviewBasic knowledge of water park
January 3, 2020Basic knowledge of water park 1. Water park concept and classification: 1. Water park concept: Water park is a kind of theme park. It has the characteristics of large tourist carrying capacity, wide playable age range, and high revisit rate.viewKey Points of Conceptual Plan Planning for Water Park Equipment - part one
August 14, 2019The first is to focus on market positioning, the second is product positioning, the third is equipment selection, and the fourth is the planning of related systems. Why should we emphasize these four issues in particular? Because this is the most error-prview