close
+8613527814016; +8613060807164​
info@gzhaisan.com
Search
Guangzhou Haisan Amusement  Technology Co., Ltd.

Haisan Experience in Theme Landscape Design of Water Park equipment

Haisan Experience in Theme Landscape Design of Water Park equipment

1. The vivid impression of substitution            

Pushing open the gate of the water park is like entering another world. In this world, various water recreation equipment and venues in the form of games, live scenes, animation and stage are given strong vitality, making recreational activities more three-dimensional and contemporary. Tourists are no longer experiencing cold equipment, but traveling through the Jurassic jungle, strolling in the kingdom of fairy tales...            

2. Scene Representation with High Reduction Degree            

The scenes constructed by physical entities such as landscape and characters are the core of experience. By taking scene reproduction and character construction as the dominant IP building mode, every element of water park, including human architecture, water recreation equipment, entertainment performance, catering shopping and ecological landscape, is restored to its vivid scenes, from material to color, from image to special effect, from scenery. See the characters and create surreal theme amusement experience.            

3. Complete and stimulating story clues            

With virtual characters or stories as brand IP, stories ignore the boundaries of time and space in project setting, and tell stories from a staggered and jumping perspective, which makes the stories unexpected. For example, Sanya Dream Water Paradise ingeniously endows the theme of "water", "jungle" and "mountain top" in the three areas of the Paradise by compiling the legendary stories of Phoenix and the three princesses, and integrates "Phoenix" into the theme. Hengdian Film and Television City Dream Valley Water Park Phase I project topics are derived from the Mummy series movies, the use of film water-related plots and water park landscape functions, water park equipment amusement experience, so that the water park has a mysterious and strong attraction theme culture. In addition, Hengdian Dream Valley Park Phase II takes "One Thousand and One Nights Story" as its theme and integrates marine culture. A small children's water pool also uses the story of "Sinbad wreck" as its clue to set up water-spraying sketches such as coral, jellyfish and mermaid. It makes full use of thematic stories and meets the needs of entertainment.

4. Persons who can communicate by turning around            

The addition of characters in story clues can make the theme packaging of the whole aquatic park alive, the staff dressed up as scene characters, or wandering around various devices aimlessly, or bring various activities and performances. They always "inadvertently" appear around the tourists, so that the tourists can interact with them in turn, and bring the perfect scene integration to the tourists.

water park equipment
water park equipment from HAISAN

Related News
  • Operation management of indoor water slide equipment in winter

    Operation management of indoor water slide equipment in winter

    March 21, 2019Among all the attractions, the most affected by the season is the water slide equipment. The water park is known as the "golden 100 days", that is, the best operating time of the water park is only 100 days, and the operating season is between the monthsview
  • Planning for Expansion on water slide company

    Planning for Expansion on water slide company

    February 25, 2017Attractions can be added to the water park to add more capacity from water slide company. No matter what the size of the water park or how many rides you have, people like to see new things. Generate additional stimulation and add a new ride in every twoview
  • Job Description of Park Manager on aqua park equipment

    Job Description of Park Manager on aqua park equipment

    February 25, 2017Parks have the responsibility of stewardship of the environment and service to the public. Park managers on aqua park equipment are responsible for handling these often contradictory missions, as well as a host of other duties.view
  • Should consider the type of water park equipment

    Should consider the type of water park equipment

    March 8, 2019When investors plan to build a water park, they may ask what type of water park equipment should be built? How large-scale water park is built? And what type of water park will be attractive, etc.view
  • New Views on Water Park equipment and Construction

    New Views on Water Park equipment and Construction

    February 25, 2017New Views on Water Park Investment and Construction There's a misunderstanding in the Water Park industry- Disneyland/Chimelong Water Park is the templete for building a water park. equiped with full line big leading water park equipment with big investview
  • Analysis Before Start Water park slide

    Analysis Before Start Water park slide

    July 7, 2017There is general agreement that the water park slide development process begins with the preparation of a market and financial feasibility study. So, what is a feasibility study and what is intended to accomplish?view
  • TEL:+8613527814016; +8613060807164​
  • FAX:+86-20-23889566
  • EMAIL:info@gzhaisan.com
  • ADDRESS:12th floor,23 Headquarters Center, Tianjin High-Tech Industrial Plaza, Panyu District, Guangzhou City, China
Online Servicetq_online