Regulations and Design of Relevant Facilities at the Initial Stage of Water Park Construction

Regulations and Design of Relevant Facilities at the Initial Stage of Water Park Construction

Ⅰ. The design of the pool of the water park project should meet the following requirements


1. The water park project pool should be designed for waterproofing, and technical measures should be taken to avoid sinking, water leakage, cracking and other problems in the pool;


2. The pool body should be equipped with climbing ladders, and the climbing interval should not be greater than 15.0m;


3. Clear and visible water depth signs should be set on the pool wall of the water park project;


4. Anti-collision measures should be taken on the wall of the tsunami pools;


5. A full-length footrest should be set at 1.20m below the water surface of the pool wall, and the width should not be less than 0.15m;


6. An overflow trough should be set on the pool wall, and an overflow grate should be set on the trough; when the overflow trough is used as overflow backwater, it should not be discharged into the dirty water of the pool bank.


7. A lifeguard safety observatory should be set up for every 100 square meters of water surface area, and the height of the safety observatory from the pool bank floor should not be less than 1.20m. The safety observatory should be able to observe the entire recreational water area;


8. The water park project pool should be equipped with emergency drainage facilities. And the drain should take measures to prevent children from inhaling;


9. The edge of the pool should be set to prevent the surrounding rainwater, sewage, etc. from flowing into the pool;


10. The width of the pool bank should not be less than 7.0m, and the angle between the pool bank and the pool body should be rounded;


11. The ground surface material of the pool bank should be non-slip and easy to clean, and a drainage slope should be set.


Ⅱ. Calculation of the number of people in the water park project


1. The maximum number of people in the pool area of the water park project at the same time is calculated as 0.5 people/m.


2. The number of people in the vehicle area should be calculated based on the passenger capacity of the water park equipment.


Ⅲ. Housing and facilities of the water park project


The auxiliary rooms and facilities of the water park project shall comply with the relevant provisions of the current national standards and shall meet the following requirements:


1. The number of changing clothes, showers, toilets and sanitary wares should be determined according to the number of people who should be in accordance with the rated passenger capacity of the amusement pool of the water park project;


2. Before entering the recreational water area, it is mandatory to pass through sanitary facilities such as showers and disinfecting foot baths. The width of the disinfection foot bath should be the same width as the passage leading to the pool, the length of the disinfection foot bath should not be less than 2.0m, and the depth should not be less than 0.20m;


3. Anti-slip measures should be taken on the ground in wet spaces such as walkways, changing rooms, bathrooms and toilets;


4. The technical equipment room of the water park project should include water treatment room, water quality inspection room, water pump room, power distribution room, etc., as well as related computer rooms and warehouses;


5. When using liquid chlorine and other chemicals for water treatment, there should be an independent chlorination room and chemical storage room;


6. Technical measures such as fire prevention, explosion prevention and ventilation shall be adopted in the chlorination room and chemical storage room.


Related News
  • The Development Of Water Park

    The Development Of Water Park

    July 6, 20171. Radiation market expansion of business areasSome large group companies operating in the park at the same time, slowly began to expand to other business areas of the market, that is diversified busi...view
  • Studying to Build a Water Park

    Studying to Build a Water Park

    July 6, 2017If you don’t have the market draw in your location, building a waterpark too big will increase your expenses, but not your revenues. If you build it too small, you may not have the amenities to attra...view
  • Types of Amusement Park Slides for Sale

    Types of Amusement Park Slides for Sale

    August 20, 2018As we all know, the amusement park equipment manufacturers china can create a lot of various amusement parks. Now, let's explore some of the more common types of amusement parks which created by these...view
  • Water Park Slide Requirements and Types

    Water Park Slide Requirements and Types

    May 26, 2020The design, construction and operation of the water park slide are highly consistent with the park's investors, managers and tourists:First of all, safety is always the first thing. As a special f...view
  • What Are the Precautions for Running a Water Amusement Park?

    What Are the Precautions for Running a Water Amusement Park?

    January 28, 20221. There should be as few types of water slides as possible for water amusement park equipmentAfter the business location of the water amusement park has been determined, some investors believe that t...view
  • Four Points to Know when Operating Water Park Facilities

    Four Points to Know when Operating Water Park Facilities

    January 19, 2023In recent years, the water park project has grown strongly and developed rapidly, becoming a bright spot. With the gradual transformation and upgrading of the water park, its business management model...view
Online Servicetq_online