Related News

On the design and capital raising of theme park from the perspective of operation-2
March 18, 2020Viewpoint 1 When first dabbling in the theme park industry, does the owner think that it's better to build a theme park, find a planning and design unit to carry out professional design at all stages, build a construction unit, and let the operview
Theme construction of queuing area(similar to building water park)
September 10, 20201. Theme story telling The queuing area is also the only area for touriststo tell the story cause and exaggerate the atmosphere before entering the themeactivity project experience. In...view
The Super Rolling Slide: A Revolution in Rotation and Dynamic Water Play
December 30, 2025In an era where guests constantly demand extreme thrills, water play has evolved beyond simple speed into a sensory art form engaging with gravity. As an industry innovation leader and full-chain serv...view
The difference between water park and theme park with "short, flat, fast" features
May 11, 2020The construction period is "short": generally it can be built in 0.6-1 years, because most of the equipment can be directly purchased and rarely customized; even if you want to add an IP theme, most of them are covered with pattern symbols, unlike a themeview
Guideline for choosing water park equipment
September 29, 2019With the rapid development of Internet, more and more customers know the water park equipment prices through the network. While these customers seem to have a problem, it's asking the price for water park project.view
Safety first: precautions for the preparation and operation of special water park equipment-part four
November 8, 201936. Use of electronic auxiliary equipment required for water park equipment operation (1) Turn on the sound amplification facilities used by the machine, adjust the volume, not too loud, too small, noise, howling, etc. If there is a fault and timely review
