close
+86 13527814016
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

Inspection for water slide equipment in water parks

Inspection for water slide equipment in water parks

It is necessary to record all inspections, operating test, water quality monitoring and control, all accidents and abnormalities faithfully by the way of log record. The record should be kept at least 6 years from the date of final entry. The record of 12 months before the date of final entry should always be kept useful for future reference. Please refer to Annex A Common Routine Water Quality Record.

The daily check of water slide should include:

(1)     Whether there is barrier in the sliding line of the slide.

(2)     Whether there is crack, fragment or bubble on the sliding surface of the slide.

(3)     Whether the joint contraction of interface is coarse or cracked.

(4)     Whether the joint of connecting flange shows the sign of inverted boss and the straight-forward jump is over 2mm.

(5)     Whether water leakage occurs at the joint of connecting flange.

(6)     Whether the guard plate at the spiral section become loose.

(7)     Whether there is any violent shake when walking into the slide.

(8)     Whether the flanged seam is split.

(9)     Whether the welding joint of platform handrails shows the sign of crack and corrosion and all bolts become loose. 

 

The weekly check of water slide should include:

(1)     Whether there is barrier in the sliding line of the slide.

(2)     Whether there is crack, fragment or bubble on the sliding surface of the slide.

(3)     Whether the joint contraction of interface is coarse or cracked.

(4)     Whether the joint of connecting flange shows the sign of inverted boss and the straight-forward jump is over 2mm.

(5)     Whether water leakage occurs at the joint of connecting flange.

(6)     Whether the guard plate at the spiral section become loose.

(7)     Whether there is any violent shake when walking into the slide.

(8)     Whether the flanged seam is split.

(9)     Whether the welding joint of platform handrails shows the sign of crack and corrosion and all bolts become loose.

(10) Whether the bolts connecting slide with its chute become loose.

water slide



Related News
  • Suitable water slide equipment is very important in water parks

    Suitable water slide equipment is very important in water parks

    May 19, 2020Hereby, we remind investors that please don't make blind investment. The first step is to make preparation and analyze water park equipment market, that is to say children's play pool belongs to the children, adults are interested in some exciting rides aview
  • Operation management of indoor water slide equipment in winter

    Operation management of indoor water slide equipment in winter

    March 21, 2019Among all the attractions, the most affected by the season is the water slide equipment. The water park is known as the "golden 100 days", that is, the best operating time of the water park is only 100 days, and the operating season is between the monthsview
  • An Analysis of China's Water Park Issues

    An Analysis of China's Water Park Issues

    April 3, 2020An Analysis of China's Water Park Issues Author: Fang Long The time has come to the second decade of the 21st century. Looking back at the first decade of this century, everyone who is familiar with the domestic amusement industry knows that this is aview
  • Suzhou Paradise Water Park Equipment

    Suzhou Paradise Water Park Equipment

    July 7, 2017Suzhou Paradise Aquatic World has been on operation for 12 years from July 1995, and the Water Park Equipment has made new transformation in September 2006.view
  • What should we pay attention to when investing in water park?

    What should we pay attention to when investing in water park?

    January 24, 2019Water park industry in this season is also a good time to start investing in the construction of water park. The site selection, planning and negotiation of the water park should start from this time to prepare or have begun to break ground.view
  • How to maximize the influence of key projects

    How to maximize the influence of key projects

    February 28, 2020How to maximize the influence of key projects Theme park projects usually have some heavy-duty amusement facilities, such as roller coasters, innovative dark rides or characteristic multimedia attractions. There are usually three or five such scenic spview
Online Servicetq_online