Related News

On the design and capital raising of theme park from the perspective of operation-5
March 23, 2020As a theme park operator, do you often ask - why do we need to raise funds for many designs in the design process? Do they specialize in design or not? Our operation tells the design unit how to design, then we have become engaged in design, what shouldview
How to do the marketing of Water Park from HAISAN water slide company Part 2
March 5, 2019In the current marketing, activity planning is regarded as a powerful tool in the implementation of marketing. Because of its short business cycle, rigid consumption, short-term consumption, instant consumption, individual play and other characteristics,view
Safety first: precautions for the preparation and operation of water park equipment-part three
November 5, 201929. the device area found that the treatment of children (1) If a post finds a child missing, he or she should go forward in time and ask the child to understand the child's loss. (2) Understand children's family characteristics, contact and comfortview
Design of moving line of parking lot and entrance-2
March 27, 2020--Disabled parking space--- The width of general disabled parking spaces is 2.5m * 1.6x = 4.0m, with a length of 5m; according to China's specifications, more than 200 parking spaces need to be set up, with more than 4 disabled parking spaces. At onview
Management for building water park
September 15, 2020After knowing these rules, we will have away to manage the tourists. There are many ways to manage tourists. Now thereare new technologies, including GPS, smart bracelets and smart tickets. For exampl...view
What is the equipment overhaul from water park design company
September 9, 2019For water park, it is off season after the Mid-Autumn Festival. If it is a pure outdoor water park, at this time, it is almost time to close the garden and tidy up and repair, waiting for the arrival of next summer, so the final Carnival will come, and ifview

